    December 1, 2006

    Open letter to Rep Dawnna Dukes


    From: Vincent J May
    To: Dawnna Dukes
    Subject: Open letter to Rep Dawnna Dukes #10.8

    Dec 1 2006

    State Rep Dawnna Dukes
    CAMPO Board

    Ms Dukes,

    Around 2002 CAMPO began assembling the 2030 Mobility Plan. The entries for 3 sections of Hwy 290 E, from 183 to Decker Lane, had a combined price of $115 million. (Very LARGE pdf, >5meg, see page 126)

    In 2003 TxDOT decided to make 290 E a toll road. They added a quarter mile to make it go from 183 to just past SH 130 and recalculated the price in 2004 to $297 million. (1 meg pdf, see page 1)

    Next, CTRMA hired a company last March, PBS&J, to get a new 2006 price estimate for 290 E. Charles River Associates (CRA) incorporated PBS&J's "Construction Cost Estimate", $584 million, into their Draft Final Report on Phase II roads. (0.4 meg pdf, see page 13) The increase in the cost of 290 E is not inflation. The first Feasibility Study price of $297 million was calculated in 2006 dollars. See page 8 of that pdf.

    (PBS&J employees pled guilty recently in a scandal whereby they embezzled millions of dollars from TxDOT and a dozen other state DOTs. The stolen money was given to politicians in what the FBI thinks may have been bribery. I think it probably was bribery. Are any CAMPO members driving new Mercedes?)

    CRA, which prides itself on how many of its people have Ph. D's, was consultant to publicly owned BC Rail when it was offered for sale. After the sale was completed, it was learned that the private buyer paid about $750 million below its true value. CRA defended its actions by blaming other people who gave CRA bad information.

    As I stated above, CRA used information supplied by a company, PBS&J, whose information may have been tainted. Would a Ph. D think twice about a road whose cost had gone from $115 million to $584 million in 4 years? Not CRA. (CRA also relied on TxDOT for an opinion on how much of a gas tax increase would be needed to replace tolls. CRA also relied on CAMPO data for their 2030 projections. When problems arise, I suppose CRA will say, "Don't blame us. We relied on other people's information.")

    Another company worked closely with PBS&J, URS, which has a history of faulty Traffic & Revenue studies. The Denver Post found that most of the toll roads that went bankrupt in recent years had been constructed by companies that had also done the Traffic & Revenue studies for those toll roads. (If you have a potential billion dollar construction contract, but you will only get the job if the T&R study supports it, and if you are also doing the T&R study, might you fudge the T&R study? Just a little?)

    CTRMA, which knows all about these things, told URS in advance, that they would get construction contracts - if the T&R studies, done by URS, supported the projects. Can you be any more corrupt?

    So much for 290 E. How about the whole Phase II plan? You won't believe it. Go back to page 13 of the CRA Final Report where you found the $584 million price for 290 E. Look at the total for all of the projects listed. It says $2.689 billion. But look at the list again. It does not include 183A, CTRMA's first project. It was priced at $527 million in 2004. $390 million has already been spent to build the first half of the project.

    Adding $527 million to $2.689 billion gives us a grand total of $3.216 billion. That is almost exactly $1 billion more than the June 2004 estimate of $2.215 billion for the Phase II toll plan. And $1 billion is exactly how much money CAMPO was expecting to earn in profits - if the roads were tolled.

    And $1 billion is exactly how much money Mr Krusee and his cronies on CAMPO want to steal from people who drive pickups, to spend on passenger trains. (They intend to steal billions more for other projects that will be of little use to motorists. But they can only do this if we let them toll us or charge exorbitant taxes on gas.)

    Sincerely,
    Vincent J May

    December 2006

    Texas Monthly


    His Way or the Highway

    Paul Burka
    Behind the Lines

    Now that Rick Perry has won another term, his transportation plan moves on down the road. What kind of a toll will it take on Texas?

    Every day I can look out the window of my office in downtown Austin and watch traffic creep along Interstate 35, half a mile away. The time of day doesn't seem to matter, nor does the weather: morning or evening, wet or dry, the snarl persists. Part of this is due to the unwieldy design of the downtown exit and entrance ramps, but the main reason is the volume of traffic, much of it commercial. I dread the drive to Dallas, which I last made on the Friday afternoon before the Texas-Oklahoma football game--surely the worst day of the year for such a trip. It took me forty minutes to negotiate the eighteen miles from downtown to the suburb of Round Rock, and much of that time was spent idling in a canyon of eighteen-wheelers.

    The announcement several years ago that the Texas Department of Transportation--TxDOT, as it's widely known--would build a toll bypass known as Texas 130 east of Austin was cause for celebration. Texas 130 was particularly welcomed by community leaders in the fast-growing town of Pflugerville, which abuts Austin to the northeast. The annexation, years earlier, by Austin of a strip of land along I-35 had kept Pflugerville from reaping the taxes generated by the high-dollar commercial property along the freeway frontage. Now, with the completion of another brand-new toll road, Texas 45, which will tie into the bypass, Pflugerville could look forward to development along the flanks of the new highway, which would relieve homeowners from bearing the principal responsibility of paying for city services. But when TxDOT announced the design of Texas 45, it had no Pflugerville exit and no frontage road, and that made the adjacent property unattractive for development. What was the reason for this oversight? It was no oversight, according to state senator-elect Kirk Watson, who, as mayor of Austin, had served on the board of the federally mandated regional mobility planning organization for the Austin area. "TxDOT," he says, "wanted to maximize its toll revenue."

    A single nonexistent exit on a single yet-to-be-completed highway is of little consequence in the big picture of transportation policy in Texas. And yet the missing Pflugerville exit is emblematic of why so many Texans are upset about that policy and why it became an issue in the governor's race: The importance of roads is not merely to make sure that you and I can get from point A to point B rapidly and safely. Roads create wealth. They multiply property values. They bring economic development. They improve the quality of life. But as Texas turns more and more to toll roads, critics of TxDOT fear that the tail is wagging the dog, that the funding mechanism has become an end in itself, and that a mammoth state agency has lost sight of its duty to serve the public and instead serves its own ends.

    This is not going to be a screed against toll roads or against Rick Perry's multi-highway Trans-Texas Corridor plan, though the opponents have made some legitimate points. Existing highways built with tax dollars ought not to be converted to toll roads; this is double taxation. Commuters should not be forced to tithe for the privilege of using a freeway overpass, as TxDOT wanted to do on another Austin expressway--conjuring up the memory of Ludwig of Bavaria, who built his medieval castle on an island in the Rhine, the better to extract tolls from passing boatmen. Yet toll roads are an essential part of our transportation future. The current revenue stream, which depends on a twenty-cents-a-gallon tax on gasoline, one fourth of which goes to education, is not enough to meet the state's needs. Without toll roads, gridlock will continue to strangle Texas cities.

    All of the rhetoric over whether to toll or not to toll has obscured a much bigger issue, which is privatization of transportation. TxDOT's plan for toll roads is to surrender public control of these roads by entering into "comprehensive development agreements" (known as CDAs) with private companies, such as the partnership between Cintra, a Spanish company, and Zachry construction in San Antonio, which is building the first link in the Trans-Texas Corridor, an alternative to Interstate 35 known as TTC-35. Cintra-Zachry paid $1 billion to TxDOT for the right to collect tolls for the next fifty years. I'm not going to make a xenophobic argument, as Carole Keeton Strayhorn did in her gubernatorial campaign, that this is a land grab by foreign companies. It doesn't really matter whether the company operating the toll road is American or European or Qatari. What matters is whether the arrangement protects the public interest. Here is what John Carona, a Republican state senator from Dallas who is the new chairman of the Senate committee that deals with transportation, has to say on that subject: "Within thirty years' time, under existing comprehensive development agreements, we'll bring free roads in this state to a condition of ruin."

    It may seem as if the system of granting a concession to private companies in return for money, like restaurants at an airport, is a great idea--"free money" that TxDOT can use to build other toll roads, enter into still more concession agreements, and build still more toll roads, as if the agency had succeeded in creating a perpetual-motion machine to finance roads in perpetuity. But alas, there is no free money, and there is no perpetual-motion machine. The private companies that will build and operate the toll roads are in business to make a profit. In order to ensure that profit, they must have people who want to drive on their roads. And--here's the rub--in order to be sure that people will want to drive on their roads, the CDAs with TxDOT will contain non-compete clauses that prohibit TxDOT from building new roads or upgrading existing highways. Any improvement to an existing highway that is not already planned at the time TxDOT enters into the contract is prohibited. That billion-dollar concession limits TxDOT's ability to improve nearby secondary roads. How about adding extra lanes? Sorry, prohibited by the CDA. An HOV express lane? Not a chance. This is why Carona says that free roads will be reduced to ruin. TxDOT will no longer be able to respond to the transportation needs of the state, other than to say: If you don't like the traffic, use the toll road.

    Oh, I almost forgot. About that free money: It may be free for TxDOT, but it isn't free for you and me. The billion dollars represents the present value of future toll revenue. TxDOT finds it attractive for the same reason that buyers of lottery tickets ask for the "cash option." They want their money up front--so they can use it now, so that it won't be eaten up by inflation--rather than have it dribble in over twenty years (or fifty). Meanwhile, the private toll road operator wants to get that billion dollars back. And the way the company will get it is by raising its tolls over fifty years, largely unrestrained by the public sector. Tolls will be market based--that is, whatever the traffic will bear. In effect, TxDOT's free money amounts to a tax on our children and our grandchildren.

    Concession agreements are not the only way to build toll roads, just the most expensive one. (Carona likens it to "renting to own.") In fact, toll road authorities have functioned in Houston and Dallas for years by using the conventional method of building the roads: issuing revenue bonds that will be paid off with toll revenues over a period of twenty to thirty years. When major league baseball first came to Arlington in the seventies, I drove to games from Dallas on the Dallas--Fort Worth Turnpike. In twenty years (1957-1977) the bonds were paid off and the turnpike became a free road, Interstate 30. It remains free today. The Dallas North Tollway followed a similar pattern, except that when the original section, from downtown to Interstate 635, was paid off, tolls continued to be collected so that the tollway could be extended farther north. The Harris County Toll Road Authority has built 101 miles of toll roads, including a section of the Sam Houston for which I gladly pay $1.25 four times in order to drive to my hometown of Galveston without having to contend with Houston traffic. This method of financing is, in the long run, far cheaper for the public than concessions and higher tolls. In the past, TxDOT cooperated with these local authorities--for instance, by making right-of-way available--but since Rick Perry has been governor, a much more aggressive department seems to regard the local toll agencies as competitors. The North Texas Tollway Authority wanted to build Texas 121, for example, but TxDOT stepped in and forced the NTTA to cede control of the project, thereby allowing TxDOT to do another concession agreement. The NTTA will be allowed to collect the tolls, but that is all.

    How did we get to this point, and what can we do about it? For years, state budget writers have been dipping into the pot of money that is earmarked for highways to fund the Department of Public Safety, on the theory that state troopers are responsible for highway safety. This ploy diverted $700 million from road building in the current biennial budget. At the same time, lawmakers have refused to raise the gasoline tax since 1991. In a Republican era, any kind of tax increase is unthinkable, even if its purpose is to further the cause of free roads. TxDOT played politics too, putting more projects on its approved list for future construction than it could afford; now it uses the length of the wish list to win the support of local transportation planning organizations for toll roads, warning communities like Austin and El Paso that their only other option is to wait 25 years for free projects.

    The final step was the 2003 legislative session, when Republicans controlled all the levers of power--House, Senate, governor--for the first time. Major bills were rushed through the Legislature with little debate or discussion. One of these was the omnibus transportation bill that authorized concessions and other mammoth changes in the way we build highways. Few lawmakers knew what was in the bill. The Senate gave it only cursory inspection. The result was a scheme in which TxDOT will be taking in billions of dollars from the private sector with no oversight by the Legislature, no responsibility to say how that money will be used, and no assurance for the public that free roads, as well as toll roads, will benefit from that money. Governor Perry has strongly supported transparency, accountability, and oversight in public education. He could do the state and the public a great service by insisting on the same standards for highways. Otherwise, we are headed for the worst public policy fiasco in my lifetime.

    October 13, 2006


    Wed., Jul. 26, 2006

    It’s Time For Some New Blood in Austin

    http://news.galvestondailynews.com/story.lasso?ewcd=4453326fa53e4680cbd62824cb3a48d8

    “Legislators fired” — that should be the next headline in newspapers throughout Texas.

    What a sham our elected officials are.

    Instead of working for Texas families and their children, they continue their ineptness and special-interest motivations.

    It is an outrage that so little was accomplished once again in a legislative session and elected officials must be held accountable by the voters, from the governor right on down the line.

    Voters need to get smart finally and vote out the vermin proliferating at the state capitol.

    Furthermore, special interests must be banned from contributing huge amounts to legislative campaigns.

    It’s time for Texans to hold elected officials accountable and to take back their legislature.

    Jamey McGhee
    Austin

    -------------------------------------------------------------------------------------------------------------------------------------------------------------------

    October 18, 2006

    Yeah, We Voted on Tolls — Kinda


    By Ben Wear  http://www.statesman.com/news/content/ news/stories/local/10/16/16wear.html

    Mary: Prop. 14 should be declared unconstitutional because it was so deceptive and misleading. Texans were had!

    Monday, October 16, 2006

    Do you remember voting on the Trans-Texas Corridor?

    Me neither. But I think I might have. Sort of.

    Toll road proponents have said over the past couple of years that Texans had voted to authorize what has turned out to be a very aggressive push for toll roads. Gov. Rick Perry said as much in the Oct. 6 gubernatorial election debate.

    One of the moderators relayed a question from a McKinney woman asking why Texans haven't gotten to vote on the "Trans-Texas Corridor and related toll highways."

    The corridor is Perry's 4,000-mile plan of tollways, railroads and utility lines.

    The governor's response was deft.

    "First and foremost, the people of Texas had the opportunity to vote on a substantial amount of that in a constitutional amendment," he began, going on to say that the Legislature had debated and passed toll laws in several sessions. The voters, he said, "sent a clear message of how we're going to build infrastructure."

    What actually happened is that in a September 2003 election, 810,855 Texans said yes to ballot language that only the most wonkish among them could have known authorized wholesale borrowing for toll roads. The 45 words on the ballot, in fact, do not include the words "toll" or "turnpike."

    Here's what Proposition 14 proposed:

    "The constitutional amendment providing for authorization of the issuing of notes or the borrowing of money on a short-term basis by a state transportation agency for transportation-related projects, and the issuance of bonds and other public securities secured by the state highway fund."

    I was told at the time that the purpose of this was to allow the agency to borrow here and there against future gas-tax revenue to address cash-flow problems. And that, in fact, is what the first part of the language refers to.

    But then there's a comma, and some more words. Some technical but powerful words that amounted, apparently, to the electorate saying, "Whoo-eee, slap some toll roads on us, baby!"

    Now, Texans did approve another constitutional amendment, this one in 2001, that created the Texas Mobility Fund, and it actually said the money could go to "state highways, turnpikes, toll roads, toll bridges, and other mobility projects." A total of 543,759 Texans said yes to that one.

    In 2003, lawmakers dedicated some fees allowing that fund to borrow $4 billion or more.

    And as the governor said, that same year the Legislature approved a huge bill allowing the creation of the Trans-Texas Corridor. That bill, passed in a session marked by Democrats fleeing to Ardmore, Okla., and a $10 billion budget gap, got little press coverage.

    Did Texans vote on the Trans-Texas Corridor? Not in any real sense.

    Did we vote on a "substantial amount" of the toll road revolution? Yes, technically, in a special September 2003 election with predictably poor turnout and all the focus on other amendments, we gave the Texas Department of Transportation carte blanche to borrow for roads and charge tolls.

    Who knew? Almost no one.

    By Ben Wear  http://www.statesman.com/news/content/ news/stories/local/10/16/16wear.html

    bwear@statesman.com; 445-3698

    -------------------------------------------------------------------------------------------------------------------------------------------------------------------

    October 8, 2006

    Halliburton’s Lobbying Efforts Paid Off: Watchdog Group

    From http://www.lonestaricon.com/absolutenm/anmviewer.asp?a=627&z=69

    WASHINGTON — A watchdog group says that the lobbying efforts of Vice President Dick Cheney’s former company paid off big-time.

    Over the last six years, Halliburton has bought influence in Washington to the tune of $4.6 million.

    At the same time, its government contracts mushroomed by over 600 percent and jumped from being the 20th largest federal contractor to sixth by 2005, according to HalliburtonWatch.

    As a result, the company gained $18.5 billion in revenue from contracts related to the war in Iraq from March 2003 to June 30, 2006. In 2005 alone, Halliburton received $6 billion in federal contracts.

    The analysis found that Halliburton’s lobbying efforts came from three main sources: the board of directors and their spouses, Halliburton’s political action committee, and the company itself.

    Halliburton’s board of directors have seen the entire value of their stock jump to over $100 million — a quadrupling between March 2003 to March 2006 due to high oil prices, contracts, and Mideast violence.

    The value of shares held by Halliburton’s largest corporate shareholder — CEO David Lesar — jumped from $17.3 million in 2003 to $66.8 million in 2006, said the HalliburtonWatch report.

    For more information, visit HalliburtonWatch’s website.

    INFO
    www.halliburtonwatch.org

    From http://www.lonestaricon.com/absolutenm/anmviewer.asp?a=627&z=69

    -------------------------------------------------------------------------------------------------------------------------------------------------------------------

    October 14, 2006

    Strayhorn ad attempts to breakdown Perry support

    From http://www.chron.com/disp/story.mpl/politics/4259735.html

    Associated Press

    Details of a new television campaign ad from independent gubernatorial candidate Carole Keeton Strayhorn:

    TITLE: "Beyond"

    LENGTH: 30 seconds.

    PRODUCER: Alex Castellanos, media consultant; WF of R Inc., media placement.

    AIRING: Started Friday in most markets; will be airing statewide by Monday.

    SCRIPT: Carole Keeton Strayhorn: "Tolls across Texas?

    "Governor Perry's plan is beyond anything we've ever known. It's the largest land grab in Texas history. A deal to seize more than a half million acres of private property and hand it over to a foreign company, so they can charge us tolls.

    "I believe Texas property belongs to Texans, not foreign companies. And I believe we ought to protect our property rights and stop this land grab. Austin doesn't.

    "It's time to shake Austin up."

    KEY IMAGES: The ad is shot in the same style as all of Strayhorn's have been so far — the candidate wearing a red blouse under a black jacket, standing before a white background and talking to the camera.

    ANALYSIS: Gov. Rick Perry's Trans-Texas Corridor has been contentious — farmers and ranchers oppose selling their land for the massive transportation network, drivers oppose having to pay tolls and others have criticized the contractor's European ties. The issue is an easy target for Perry challengers and Strayhorn has led the charge against it. By putting the issue on television, she's taking it directly to voters — who may not have been paying close attention before now — and offering them an alternative. Strayhorn continues to poll below Perry, but she hopes that ads like this will breakdown enough of his support to give her an edge.

    FACT CHECK: She calls the project the "largest land grab in Texas history." While the state plan could eventually include as much as 4,000 miles of highway, the state authorized 7,500 miles of farm-to-market roads in 1946. That grew to 35,000 miles in 1962 and included 41,755 miles by 1989. Strayhorn's campaign argues that the farm-to-market road system is still smaller than Perry's corridor because the rural roadways are not as wide as the swath planned for the new highway system.

    Strayhorn contends the land will be "handed over to a foreign company." The contractor, Cintra-Zachry, is a consortium made up of Spain-based Cintra investing 65 percent and San Antonio-based Zachry Construction in for 35 percent. They've partnered with 16 other firms, which include two European-based companies.

    Texas will own and control the roads, but Cintra-Zachry will maintain the roads and collect the tolls.

    Strayhorn herself issued a press release in 2001 saying the Texas Department of Transportation should build more toll roads. Her campaign said she never envisioned such a sweeping toll road plan as Perry's Trans-Texas Corridor plan, adding that the transportation department's budget has increased enough in recent years to build roads without tolls.

    ———

    Analysis by April Castro, Associated Press writer.

    From http://www.chron.com/disp/story.mpl/politics/4259735.html

    -------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Carol Cespedes and Nina Butts, LOCAL CONTRIBUTORS
    http://www.statesman.com/opinion/content/editorial/stories/09/25/25Cespedes_edit.html

    Springs, clear creeks, majestic live oaks. These are the pride of Austin. Those of us lucky and plucky enough to live here are nourished by Austin's natural setting.

    Southwest of downtown Austin, Oak Hill is blessed with live oaks hundreds of years old. Oak Hill was named for these titans. Williamson Creek is a clear, spring-fed creek running through the heart of the community.

    But the Texas Department of Transportation is revving up the chainsaws and bulldozers to destroy these invaluable natural features of Oak Hill. TxDOT plans to cut down the majestic live oaks, and put Williamson Creek into a ditch. If TxDOT gets its way, the Oak Hill Y at U.S. 290 and Texas 71 will look just like the superhighway mixmaster at U.S. 183 and Interstate 35.

    Fix 290, a coalition of Oak Hill property owners, neighborhood associations, and environmentalists, has proposed an alternative to TxDOT's superhighway. Our concept is simple: a six-lane, mostly grade-level parkway that will move traffic safely and keep the majestic live oaks and Williamson Creek intact.

    An independent transportation-engineering firm, Smart Mobility, analyzed the Fix 290 alternative and concluded that the "plan will provide the needed vehicular capacity to meet the CAMPO (Capital Area Metropolitan Planning Organization) 2030 daily traffic projections for this location. Further, this plan will result in many longer term benefits to the region."

    A parkway can meet traffic needs without ruining Oak Hill. We believe that TxDOT's superhighway will be bad for business, bad for property values, bad for water and air quality, and just plain bad for Oak Hill.

    Elevating U.S. 290 for two miles, as TxDOT plans, will damage the sense of community and spell doom for many small businesses. The elevated lanes will bring a permanent increase in noise and light pollution. The flyover intersection will overwhelm the commercial hub at the Oak Hill Y.

    The road will take at least three years to build, snarling traffic and testing tempers. TxDOT's price tag, almost $200 million, will mean a sweet prize for the winning contractor. Highway contractors contribute lavishly to political campaigns in Texas, and only two Texas contractors, Cintra-Zachry and Williams Brothers, are big enough to take on the Oak Hill project.

    Our parkway alternative is far less expensive than TxDOT's design and will take far less time to build. It also provides better access for local businesses and reduces the barrier imposed by the highway to a scale that can be easily spanned by pedestrian and bicycle bridges. With reduced asphalt and disturbance to Williamson Creek, the Fix 290 plan would provide improved water quality for the Edwards Aquifer and Barton Springs.

    More than 1,700 citizens have signed our Fix 290 online petition. The Oak Hill Association of Neighborhoods endorsed our parkway plan in May. With the help of Sen. Gonzalo Barrientos, we presented our conceptual design to CAMPO in June, where it was well-received. We are now working for a directive from CAMPO to redesign the highway according to the parkway concept.

    With the help of CAMPO, the creek and live oaks enjoyed by our ancestors will thrive for centuries to come.

    Cespedes is president of South Windmill Run Neighborhood Association in Oak Hill. Butts teaches English at Austin Community College. Read the Smart Mobility report at Fix290.org.

    http://www.statesman.com/opinion/content/editorial/stories/09/25/25Cespedes_edit.html



    September 18, 2006

    The Toll Road "Hustle" Continues...

    Believe it or not, toll roads are here already!

    By Peter Stern     http://pstern.statesmanblogs.com/

    Even though most Texans don't want toll roads officials will open them in November. The temporary "free" [no tolls] promo is another con game so that once drivers use the new roads, they won't go back to using the old roads when the tolls become enforced.

    "Free" toll roads bodes a good game plan for the November elections.

    Supposedly voters won't get angry until the tolls are charged sometime after the elections.

    While many Texans don't know the history of the extremist politics behind toll roads, they have "bought into" the misleading information provided by the governor's office and the Texas Department of Transportation (TxDOT) --- that toll roads are the only and/or best way to build, operate and maintain Texas roadways and that the state hasn't the tax funds to finance new and/or to improve old roadways.

    BTW, there is no proof whatsoever that the proposed toll roads will ease-up traffic, in fact, most toll roads cause additional problems.

    In truth, toll roads are one of the LEAST cost-effective methods of collected taxes for building and maintaining roadways, whereby up to 50-percent of all tolls collected immediately go to the private company that manages the toll roads.

    To get its contract with the state CINTRA, the Spanish world-wide toll maven, agreed to pay TxDOT (the state) $7.2 BILLION upfront for its 70-year toll road supremacy in Texas.

    DOES ANYONE KNOW WHERE THAT UPFRONT MONEY IS GOING?

    It's doubtful because TxDOT and CINTRA have filed a lawsuit against the Office of the Attorney General, who stated that CINTRA's contract should be open to the public under the laws of the Public Information Act. The lawsuit states that TxDOT wants to protect its client CINTRA under the Privacy Act, citing that other toll companies may gain an edge if the information becomes public.

    If you believe that one, I have some ocean-front property in Central Texas I'll sell you at a fantastic price!

    Believe whatever you want about the pending toll roads, but apparently toll roads have taken a life of their own when 90-percent of the public doesn't want them but officials are pushing them upon us anyway!

    The only ones who truly benefit from toll roads are the governor's special interest campaign contributors and also legislators like Rep. Mike Krusee and his cohorts who already are getting something in return for their efforts!

    We desperately need to vote-out Perry and special interest legislators in the next several elections!

    By Peter Stern


    Toll roads to open Nov. 1
    Perry aide denies that earlier debut before election is politically motivated

    By Ben Wear
    AMERICAN-STATESMAN STAFF
    Saturday, September 16, 2006

    Central Texas will join Dallas and Houston in the Texas toll road fraternity on Nov. 1, when all or parts of the area's first three turnpikes will open to traffic, state officials confirmed this week. With no tolls, temporarily.

    To meet that earlier date — officials in June had predicted a December opening of about 40 miles of tollways — the Texas Department of Transportation will initially bring down the barricades on just 26.3 miles of Texas 130, Texas 45 North and an extension of MoPac Boulevard (Loop 1). The other 13.8 miles of Texas 130 previously announced as part of this tollway premiere, from near Hutto to Interstate 35 north of Georgetown (and perhaps more of Texas 45 North, west of Loop 1), likely will open in early December.

    Starting Nov. 1, cars will pass through the toll booths on 26.3 miles of MoPac Boulevard (Loop 1), above, along with Texas 130 and Texas 45 North. For two months, the toll roads will be free.

    Even in its incomplete form, what the state calls the Central Texas Turnpike Project will offer an alternative expressway to I-35 via Texas 45 North and Loop 1 for people going to and from Round Rock, as well as a partial eastern bypass of Northeast Austin on Texas 130. The speed limit on all three roads will be 70 mph.

    All the roads will be free for the first two months. This is a common promotional practice for toll roads, allowing drivers to sample the road at no cost and, toll agencies hope, engendering some good will for the paying days to come.

    In early January, cash customers will begin paying tolls of about 15 cents a mile. But people with an electronic toll tag (called a TxTag by the agency) on their windshields and an account on file with the Transportation Department will get yet another month of free service. And in February, TxTag users will pay only half price. In March, the promotions end.

    Those extra financial breaks for people with TxTags are an effort to get more people to sign up and use them, turnpike director Phillip Russell said this week. Toll transactions with tags (an overhead reader detects the passing tag and triggers a debit to the tag owner's transportation account) cost the agency much less than dealing with cash and having to hire people to staff toll booths, officials say. Having fewer people swerving and jerking to a stop for toll booths causes less congestion and fewer accidents, they say.

    And toll tags, like credit cards, have the additional advantage — from the seller's point of view — of making toll payments an invisible and seemingly painless purchase.

    Officials expect to cut the ribbon after rush hour on that Wednesday morning of Nov. 1 where the new Texas 45 North tollway meets the new Texas 130 turnpike in a tangle of flyover bridges. The early opening — and free service — will come just six days before toll road advocate Gov. Rick Perry stands for re-election, timing that at least one of Perry's opposing campaigns found more than suspect.

    "Clearly this is being directed by the governor's campaign," said Mark Sanders, spokesman for Texas Comptroller Carole Keeton Strayhorn, running as an independent for governor. "What the governor is doing is pushing the collection of tolls just past the November election because he knows it's going to cost him votes and probably the election."

    Perry spokeswoman Kathy Walt, asked about the opening switch, said she hadn't even heard it was occurring in November rather than December. Perry, at least as of Thursday, didn't have the ribbon-cutting on his schedule, she said.

    "He did not ask them to open it early," Walt said. "Obviously the governor's been interested in making sure that TxDOT moves projects along as quickly as possible to address traffic congestion. But TxDOT makes the decisions when segments of roads are opened all the time."

    Transportation Department officials, meanwhile, said the change in plans has nothing to do with politics. Instead, they said, money — specifically the $2.3 billion the agency acquired through a 2002 bond sale and is using (along with $1.2 billion of local and state tax dollars) to build the three roads — offers plenty of incentive to open the road and begin bringing in revenue as soon as possible. Since 2003, the agency, using some of the money it borrowed, has been paying between $74 million and $86 million a year in debt payments.

    Revenue isn't predicted to top the $86 million figure until 2011, when operating and maintenance expenses will have kicked in as well Unless traffic and revenue exceed projections, the system won't operate in the black for many years.

    Debt payments will increase over the next 36 years to almost $500 million a year, according to documents from the 2002 bond sale.

    "You've borrowed money, and that interest clock is ticking," Russell said. "You want a toll road to open as soon as possible. It may not be perfect, but it will be safe."

    Safe, perhaps, but far from complete.

    Russell said landscaping and other finishing touches will continue for months on the sections opening in November and December. But more important, Texas 130 will open without completion of a flyover bridge that will allow unobstructed left turns for people traveling from U.S. 290 eastbound to Texas 130 northbound. Drivers, until that bridge is complete early next year, will make those turns using a more traditional ground-bound interchange of frontage roads and stop lights.

    And the incomplete sections of Texas 130 south of U.S. 290 (it will extend another 20 miles to Mustang Ridge by the end of 2007) and, at least briefly, north of U.S. 79 mean continuing construction and obstruction in those areas. Aside from the ongoing work on Texas 130 by contractor Lone Star Infrastructure, the state has other companies at work on Texas 45 North from west of Loop 1 to U.S. 183 at Lakeline Mall.

    And the Central Texas Regional Mobility Authority has yet another contractor building a fourth toll road, U.S. 183-A, that will run north for more than four miles from Texas 45 North to Cedar Park. The mobility authority is also building seven more miles of free frontage roads, extending north from the end of the U.S. 183-A toll road and running beyond Leander. Years from now, when traffic merits it, toll express lanes will be built in the middle of those frontage roads to extend the turnpike.

    In all, there should be about 70 miles of operating toll roads in Central Texas by the end of next year.

    All of them will have both electronic toll gantries and cash toll booths. Customers with toll tags will be able to drive at full highway speed under those gantries and go through toll stations on entrance and exit ramps without pausing. Cash customers will give money to toll collectors or, in some cases, toss correct change into a basket.

    Drivers using cash will pay 75 cents at the single mainlane plaza on Loop 1 and another 75 cents on Texas 45 North, and on many ramps will pay another 50 cents to enter or exit the tollway. On Texas 130, the single main lane toll plaza in the section opening Nov. 1 will carry a cash charge of $1.50, and the charge on certain ramps will likewise be 50 cents.

    In all cases, customers with toll tags will pay 10 percent less.

    By Ben Wear bwear@statesman.com; 445-3698



    THE NEW WORLD DISORDER

    Kansas City customs port considered Mexican soil?

    WND investigation finds new evidence U.S. facility to be on foreign territory

    Posted: July 5, 2006
    1:00 a.m. Eastern

    By Jerome R. Corsi
    © 2006 WorldNetDaily.com

    A Mexican customs facility planned for Kansas City's inland port may have to be considered the sovereign soil of Mexico as part of an effort to lure officials in that country into cooperating with the Missouri development project.

    Despite adamant denials by Kansas City Area Development Council officials, WND has obtained e-mails and other documents from top executives with the KCSmartPort project that suggest such a facility would by necessity be considered Mexican territory – despite its presence in the heartland of the U.S.

    The documents were obtained with the assistance of Joyce Mucci, the founder of the Mid-America Immigration Reform Coalition, under the provisions of the Missouri Sunshine Law from the City of Kansas City, Mo., and from the Missouri Department of Economic Development.

    The documents reveal a two-year campaign initiated in 2004 and managed by top SmartPort officials to win Mexico's agreement to establish the Mexican customs facility within the Kansas City "inland port." Kansas City SmartPort launched a concerted effort to advance the idea, holding numerous meetings with Mexican government officials in Mexico and in Washington to push the Mexican port idea in concert. The effort involved Missouri elected officials, including members of the U.S. House of Representatives and Senate.

    The documents make clear that Mexico demanded Kansas City pay all costs. To date, the Kansas City Council has voted a $2.5 million loan to KC SmartPort to build the Mexican customs facility in the West Bottoms near Kemper Arena on city-owned land east of Liberty Street and mostly south of Interstate 670.

    "Kansas City, Mo., is leasing the site to Kansas City SmartPort," Tasha Hammes of the development council wrote to WND last month. "It will NOT be leased to any Mexican government agency or to be sovereign territory of Mexico."

    Yet, an e-mail written June 21, 2004, by Chris Gutierrez, the president of the KC SmartPort, stated that the Mexican customs office space "would need to be designated as Mexican sovereign territory and meet certain requirements."

    Even more recently, an e-mail dated March 10 of this year was sent by Gutierrez to a long list of recipients that left no doubt that KC SmartPort has not yet received federal government approval to move forward with the Mexican customs facility. Gutierrez informed the e-mail recipients that the processing a critical form, designated "C-175," needs approval by the U.S. Customs and Border Protection before the form is passed to the State Department for final approval. The processing and approval of the C-175 application is holding up the final approval of the Mexican customs facility.

    In the same memo, Gutierrez reported on a recent meeting in Washington: "Both sides (U.S. and Mexican officials) met several weeks ago and the 'document' or as the U.S. refers to it the 'C-175' is near completion. This document is the basis for the procedural, regulatory, jurisdictional, etc. for the project. It defines what will happen and how and what laws, etc. allow this to happen. Both sides have put a lot of effort into this document."

    Gutierrez appeared concerned that the intensive lobbying done by KC SmartPort could be a wasted effort if the final U.S. government approvals were not completed before Mexico elected a new president this week.

    "The process for the document is for U.S. Customs to present the document to the acting Commissioner and officials with the Dept of Homeland Security," he wrote. "This will happen in March. The document will then be reviewed by the U.S. State Dept who has been consulted on the document all along so they are aware of it. State will make the recommendation on the diplomatic status of the Mexican officials and the documents fit with existing agreements, accords or treaties. Mexico will wait for this recommendation and then get the sign off of their Foreign Ministry (Secretary [Luis Ernesto] Derbez and Under Secretary [Geronimo] Gutierrez are well versed on the project and support it). The hope of both sides is that this will be completed before the Mexican presidential elections in July."

    Gutierrez's March 10 e-mail ended by expressing a hope that discussion of the Mexican customs facility issue could be kept from the public, obviously concerned that press scrutiny might end up producing an adverse public reaction that could destroy the project. Gutierrez specifically proposes a low-profile strategy designed to keep the KC SmartPort and the Mexican customs facility out of public view.

    "The one negative that was conveyed to us was the problems and pressure the media attention has created for both sides," he wrote. "They want us to stop promoting the facility to the press. We let them know that we have never issued a proactive press release on this and that the media attention started when Commissioner (Robert) Bonner was in KC and met with Rick Alm. The official direction moving forward is that we can respond to the media with a standard response that I will send out on Monday and refer all other inquiries to U.S. Customs. I will get the name from them to refer media calls."

    Robert C. Bonner is the commissioner of CBP within the U.S. Department of Homeland Security. Rick Alm is a reporter for the Kansas City Star.

    On May 16, Bonner addressed the Chamber of Commerce in Kansas City, saying the Mexican customs facility idea "could be enormously important to Kansas City and the surrounding area, and would – or should – facilitate trade for U.S. exporters by expediting the border clearance process for U.S. goods and products exported to Mexico." Bonner added that "If the Kansas City SmartPort is implemented, Kansas City could become a major new trade link between the U.S. and Mexico."

    Among those copied on Gutierrez's e-mail of March 10, 2006, was George D. Blackwood, the president of NASCO (North America's Super Corridor Coalition, Inc.). Blackwood is an attorney with Blackwood, Langworthy & Tyson in Kansas City. He also served as the former chairman of the North American International Trade Corridor Partnership, which he helped found in 1998 when he was serving as mayor pro tem of Kansas City. NASCO supports the Kansas City SmartPort's initiative to establish a Mexican customs facility as part of the NASCO SuperCorridor project.

    By Jerome R. Corsi

    http://pstern.statesmanblogs.com/



    September 10, 2006

    Transportation Secretary Nominee is a Toll Proponent


    Subj:Transportation Secretary Nominee is a Toll Proponent
    Date:9/6/06 1:08:55 PM Central Daylight Time

    The following column appears today on the Citizens for a Better Waller County website www.wallercountycitizens.org. It is written by Alice Sorsby McGuffie

    Permission to duplicate granted
    #########################################################
    *****************************************************************
    ALICE'S VIEW
    September 6, 2006

    On Tuesday, September 5, 2006 President Bush indicated he would nominate Mary Peters to be the next transportation secretary. Ms. Peters has been a vocal advocate for toll roads, for privatizing our highway system, and for the Trans Texas Corridor.

    Ms. Peters is currently the Sr. Vice President of HDR, Inc., an engineering firm that is currently doing work on the Trans Texas Corridor-35 project. She is a member of an advisory board for the Reason Foundation, a think tank that has actively supported the Trans Texas Corridor concept.

    Ms. Peters was also very recently the Federal Highway Administrator and in that role helped push through federal legislation (SAFETEA-LU) that allows public highways to be turned over to private companies.

    On March 11, 2005 Mary Peters joined Gov. Rick Perry and Ric Williamson, chairman of the Texas Transportation Commission for the contract signing between TxDOT and the private consortium, Cintra-Zachry, to develop the first leg of the Trans Texas Corridor, TTC-35.

    "We are experiencing increasing congestion on our nation's highways, railways, airports and seaports," Mary Peters has said. "... we're robbing our nation of productivity and our citizens of quality time with their families."ť "Public-private partnerships in transportation hold great promise in cutting the congestion that's choking our economy and keeping families apart from one another."

    Interesting words Ms. Peters uses "robbing our nation of productivity and our citizens of quality... choking our economy and keeping families apart from one another." It is the very cure she proposes for traffic congestion, Public Private Parnerships, that will be doing the robbing, choking, and keeping families apart.

    Mary Peters faces Senate confirmation before she can step into the role of Transportation Secretary.

    Texas Senator, Kay Bailey Hutchison, serves on the Senate COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION. Senator Hutchison can and should oppose the confirmation of Mary Peters. Senator Hutchison can be contacted at

    http://www.senate.gov/~hutchison/e-mail.htm
    WASHINGTON OFFICE
    284 Russell Senate Office Building
    Washington, DC 20510-4304
    202-224-5922
    202-224-0776 (FAX)
    202-224-5903 (TDD)

    TEXAS OFFICES
    Austin http://www.senate.gov/cgi-bin/exitmsg?url=http://www.ci.austin.tx.us/
    961 Federal Building
    300 East 8th Street
    Austin, Texas 78701
    512-916-5834
    512-916-5839 (FAX)

    By Alice Sorsby McGuffie

    You have permission to duplicate this article.


    Follow-up to the last article.

    Bush's new Transportation Secretary and the Trans Texas Corridor
    By Wayne Madsen
    Friday, September 8, 2006
    >From http://www.WayneMadsenReports.com/


    In Mexico they call it Plan Puebla Panama.

    Sept. 8/9/10, 2006 -- George W. Bush's pick for Transportation Secretary represents a major conflict-of-interest designed to spur the construction of the Trans-Texas Corridor -- a project in which Bush and his cronies are heavily invested. Last week, Bush nominated Mary Peters to replace Norman Mineta as Secretary of Transportation. Unlike Mineta, a former congressman who then became a Vice President fo the aerospace defense giant Lockheed Martin, Peters comes out of the surface transportation industry. She is a vice president for the engineering firm HDR and co-vice chairman of the National Surface Transportation Policy and Revenue Study Commission. From 2001 to 2005, Peters was the head of the Federal Highway Administration. Peters is also a former head of the Arizona Department of Transportation. Peters worked in the administration of disgraced GOP Governor Fife Symington, who was convicted of bank fraud and resigned from office. (Symington was later pardoned by his college friend, President Bill Clinton). Peters' commitment to major "infrastructure development" of the nation's highways centers on the development of the North American SuperCorridor (NASCO) highway, of which the Tran-Texas Corridor will be a major component. Already, Bush crime syndicate cronies, including interests tied to Texas Governor Rick Perry, are purchasing property along the proposed Texas highway route at cut-rate prices, using "eminent domain" statutes to pay less than what private and commercial property is worth. The money for the massive land grab is coming from Saudi and Chinese sources, according to knowledgeable sources in Texas. The NASCO highway will cross 11 states: Texas, Oklahoma, Kansas, Missouri, Iowa, South Dakota, North Dakota, Minnesota, Michigan, Indiana and Illinois. It will also connect proposed Mexican super ports in Manzanillo, Mazatlan, and Lazaro Cardenas to various United States trucking and distribution super-hubs in San Antonio, Dallas, Kansas City, as well as one in Winnipeg in Canada. The Mexican ports will be receiving points for manufactured products from China. The theft of the Mexican presidency by conservative Felipe Calderon at the expense of populist leader Andres Manuel Lopez Obrador was engineered to protect the sizeable investments the Bush crime cartel, including The Carlyle Group, and their Saudi and Chinese financiers have already sunk into the project.


    New Transportation Secretary Mary Peters to ensure Bush crime family super-highway projects proceed unimpeded.

    Eventually, NASCO will be expanded as far south as Argentina by linking North America to Central America (Mexico-Central American Corridor and an improved Pan American Highway). The expensive tolls charged throughout the 10-lane super-highway system will be used to line the pockets of the Bush family well into the middle of the 21st century. Peters, as a highway and trucking industry shill, has been entrusted by the Bush crime cartel to ensure that the plans for NASCO and the Pan American Super Corridor proceed unimpeded. It is estimated that as many as 1 million Texans alone, many in rural and poor urban areas, could be displaced by the Trans-Texas Corridor.


    Mary Peters at Transportation: Major responsibility is to ensure roadblocks to North American SuperCorridor are eliminated.


    By Wayne Madsen



    Protest of the Gov. Perry- DoubleTax Toll -- Hwy. 121, Dallas, Ft. Worth
    Pictures & Video clips!

    By Linda Curtis

    Tuesday, August 29, 2006----Today's Protest in Coppell, Texas at Perry's Celebration of the Tolling of Hwy. 121 -- the first freeway toll conversion in the state under HB 3588, the same legislation that created the Trans-Texas Corridor.



    Check out these short news video clips in DFW, Channel 5: http://www.nbc5i.com/news/9754839/detail.html
    Here's a video clip from Channel 11. Watch TxDOT boss, Rick Williamson, squirm: http://cbs11tv.com/consumer/local_story_241165325.html
    Dear All:

    We had some fun this morning in Coppell, Texas, protesting Rick Perry's "celebration" of the first freeway-toll conversion, Hwy. 121. Except -- wait a second -- late yesterday, TxDOT announced that the 121 tolling would be delayed to sometime in November (after the election)! But then...wait another second, Ric Williamson (TxDOT Boss) today at the "celebration" said, 'we might not toll until January', citing the need to "test their equipment". Does he mean their toll equipment, or their voting machines??? Hah!

    IF YOU LIVE IN THE DFW area join us and Carole Keeton Strayhorn this Thursday in Lewisville for a press conference with Stop121Tolls.com founder (and Indy Texans), Randy Jennings. They will be telling you the truth - we know you CAN handle it -- about Perry's new genre of "double-tax" toll roads -- he and his highway robbin' contributors want to put tolls on roads we've already paid for through the gas tax! Go to Stop121Tolls.com for details.

    We are identifying precinct, city and state organizers for the Strayhorn campaign between now and election day.

    If everyone does something -- and we're counting on thousands of people across the state-- we will dump this Governor, his Corridor and his double-taxing, double-dealing ways. Then, together with Carole, Texans will have a fighting chance to take back Texas!

    Reply to this email and let us know we can count on you! Then, we'll give you a call, or feel free to call us.

    Independently yours,
    Linda Curtis, founder
    Independent Texans
    http://indytexans.org
    PO Box 14294
    Austin, TX 78761
    512-535-0989 Austin
    817-921-2417 DFW

    Save These Dates:

    Sept. 30, Saturday, (times to be announced soon) Hands Across the Corridor, coming to your community.

    Friday, Oct. 6, at 7 pm, first televised gubernatorial debate, Channels to be announced. Plan to watch with friends & family.
    _______________________________________________
    indy-discussion mailing list
    indy-discussion@lists.independenttexans.com
    by L. J. Curtis


    TEXAS INSIDER
    Perry: SH 121 Bypass Is Landmark in Texas Transportation http://www.texasinsider.org/scoop/Scoop_GovPerry-08-30-06-SH121IsLandmarkInTXTrans.htm

    COPPELL – Gov. Rick Perry today dedicated the opening of State Highway 121 Bypass, calling it a landmark in the history of Texas transportation.

    “It is the first road to be completed as a project stemming from legislation passed in 2003 that has allowed Texas to develop new and better ways to pay for highway construction,” Perry said. “And State Highway 121 will be the Texas Department of Transportation’s first all-electronic toll road, with no toll booths to slow traffic down or contribute to accidents and no hassle of digging around for spare change.”

    Although the bypass, also known as the Golden Corridor, was built as a toll road, motorists will continue to be allowed to drive on the road at no charge throughout the fall as TxDOT tests the new electronic toll-tag readers.

    “This announcement means that drivers will not only have a few extra months to enjoy a toll-quality road without the cost, they will also have more time to get an electronic TxTag sticker, which gives drivers a 10 percent discount on the Golden Corridor and every other toll road in Texas,” Perry said.

    Motorists who use the North Texas Tollway Authority’s TollTag or the Harris County Toll Road Authority’s EZ TAG won’t need a new sticker. And those who would rather pay per trip will still be able to drive on State Highway 121, thanks to new technology that will allow them to get a bill by mail, although the cost will be a little more.

    “By leveraging the latest technology and the resources of the private sector, SH 121 will provide North Texans a route that is faster, safer and more efficient – as well as funding for additional road improvements in this part of the state,” Perry said.

    Toll revenue from the 121 Bypass will help provide the $200 million it will cost to widen I-35 East through Denton County, the $80 million reconstruction project of FM 423, and many other projects that will help get traffic moving in North Texas.

    By the Texas Insider
    http://www.texasinsider.org/scoop/Scoop_GovPerry-08-30-06-SH121IsLandmarkInTXTrans.htm


    Carole Keeton Strayhorn & friends working to stop Rick Perry's double-tax tolling of Highway 121 in the DFW area.



    Randy Jennings, Stop121Tolls.com

    Thanks so much for coming, y'all. Hope to see you at meetings happening in your area (check the indytexans.org events calendar) and be sure to SAVE THIS DATE -- Saturday, September 30th for Hands Across the Corridor, coming to your local county courthouse. Stay tuned for details!

    Wanna help? Reply to this email or give us a call at 512-535-0989.


    August 21, 2006

    Strayhorn Outlines Transportation Plan To TxDOT On Last Day of Comments


    Expand Existing IH 35, Implement Ports to Plains, Telecommuting Expansion, Appoint Inspector General over TxDOT

    (Austin) – On the final day the Texas Department of Transportation accepted comment on the Trans Texas Corridor, Texas Comptroller Carole Keeton Strayhorn, Independent Candidate for Governor, today told the agency her administration will expand IH-35 using existing rights of way, implement the ports to plains initiative, expand her successful use of telecommuting and appoint an inspector general to oversee the agency and a transportation ombudsman to talk to Texans.

    “This agency is not listening to the people,” Strayhorn said. “At 56 hearings over 21 days, TxDOT ignored the overwhelming majority of people who testified against the Trans Texas Catastrophe. They even went so far as to tell Texans that they could not stop this boondoggle – even if they elected a new governor.

    “Well, they are dead wrong. I will blast this corridor off the bureaucratic books and replace it with a common-sense plan to address our transportation needs.

    “My plan is a better approach than the Governor’s secret agreement with a company based in Madrid, Spain, to seize more than half a million acres of private Texas property and build toll roads across the state,” she said. “The Governor said if someone has a better idea then lay out that plan. Today, I am outlining a better plan – one that puts Texans first, not special interests.”

    Strayhorn’s plan includes protecting Texas farm and ranch land, improving coastal evacuations, increasing capacity of existing freeways and railways, encouraging family-friendly telecommuting, and appointing an independent inspector general over TxDOT as well as an ombudsman to listen to the people.

    “Texas property belongs to Texans, not foreign companies,” Strayhorn said. “To meet our transportation needs we need freeways not toll ways, and we must use existing rights of way and increase efficiency of existing roadways and ports. We must not destroy our precious farm and ranch land.”

    Strayhorn testified against the Trans Texas Corridor at 14 public hearings held by the TxDOT, at which she detailed revenue sources available to the state instead of tolls. The Governor refuses to back off his Trans Texas Corridor plan, despite widespread opposition from Texans at the hearings.

    “I stood with Texans from the Rio Grande Valley to the Red River who oppose the Governor’s attempt to seize land and build toll roads across Texas,” Strayhorn said. “I listened to the people of Texas and the people of Texas are overwhelmingly opposed to this $184 billion boondoggle.

    “Texans deserve to hear the truth,” she said. “And the truth is much of the work to help Texans get from here to there has already been done.”

    Strayhorn submitted three reports to TxDOT – their own 1999 state analysis calling for the expansion of IH 35 using existing rights of way, the Ports to Plains study that will relieve existing congestion by improving transportation from South Texas through West Texas using existing roads, and her recommendation to expand telecommuting.

    “Family friendly telecommuting is up to 15 percent in my agency,” Strayhorn said. “The employees love it, it keeps folks off the road, and it works,” she said.

    Strayhorn will:
    • Increase capacity on IH-35 using existing rights of way without tolls and prioritize the West Texas Ports-to-Plains highway system;
    • Appoint an independent inspector general and an ombudsman at TxDOT;
    • Increase the use of Texas ports from Orange to Brownsville and improve rail and road systems from the coast to the interior of Texas;
    • Improve and increase efficiency of the state’s rail system along existing rights of way; and
    • Use telecommuting and staggered work schedules to ease traffic congestion and decrease pollution.
    “Texas once had and can again have a freeway system that is the envy of the nation,” Strayhorn said. “I am adamantly opposed to any toll roads in Texas.”

    Strayhorn’s transportation plan is part of her Texas First Agenda, a series of initiatives and solutions that she will be releasing in the coming weeks.

    Statement of Carole Keeton Strayhorn August 21, 2006
    • This is the last day the Texas Department of Transportation is accepting comments on the Trans Texas Corridor and I am outlining my transportation plan and submitting three documents I hope they will consider as they review this ill-conceived project.
    • The documents show how we can expand IH-35 using existing right of ways, implement the ports to plains initiative and expand my successful use of telecommuting.
    • As part of my plan, I am also announcing today that I will appoint an inspector general to oversee the agency and a transportation ombudsman to talk to Texans.
    • This agency and the Austin establishment are not listening to the people. At 56 hearings over 21 days, TxDOT ignored the overwhelming majority of people who testified against the Trans Texas Catastrophe. They even went so far as to tell Texans that they could not stop this boondoggle – even if they elected a new governor.
    • Well, they are dead wrong. I will blast this corridor off the bureaucratic books and replace it with a common-sense plan to address our transportation needs.
    • My plan is a better approach than the Governor’s secret agreement with a company based in Madrid, Spain, to seize more than half a million acres of private Texas property and build toll roads across Texas. The Governor said if someone has a better idea then lay out that plan.
    • I went to the hearings and I listened to the people and today I am outlining a better plan – one that puts Texans first, not special interests.
    • My plan includes protecting Texas farm and ranch land, improving coastal evacuations, increasing capacity of existing freeways and railways, encouraging family-friendly telecommuting, and appointing an independent inspector general over TxDOT as well as an ombudsman to listen to the people.
    • Texas property belongs to Texans, not foreign companies. To meet our transportation needs we need freeways not toll ways, and we must use existing rights of way and increase efficiency of existing roadways and ports. We must not destroy our precious farm and ranch land.
    • I testified against the Trans Texas Corridor at 14 public hearings held by TxDOT, where I detailed revenue sources available to the state instead of tolls.
    Four points --
    4 billion dollars in Texas Mobility Bonds
    An additional 3 billion dollars in revenue bonds
    Increased federal dollars
    And increased tax collection at the state level
    • The Governor refuses to back off his Trans Texas Corridor plan, despite widespread opposition from Texans at the hearings.
    • I stood with Texans from the Rio Grande Valley to the Red River who oppose the Governor’s attempt to seize land and build toll roads across Texas. I listened to the people of Texas and the people of Texas are overwhelmingly opposed to this $184 billion boondoggle..
    • Texans deserve to hear the truth. And the truth is much of the work to help Texans get from here to there has already been done..
    • Two of the reports I am sharing with the people of Texas and that I am sending to TxDOT are their own -- a 1999 state analysis calling for the expansion of IH 35 using existing right of ways, let me make very clear, using existing right of ways without tolls, and the Ports to Plains study that will relieve existing congestion by improving transportation from South Texas through West Texas using existing roads, and without tolls, and my own recommendation to expand telecommuting..
    • Family friendly telecommuting is up to 15 percent in my agency. The employees love it, it keeps folks off the road, and it works..
    • My plan -- I will:
      1. Increase capacity on IH-35 using existing right of ways without tolls and prioritize the West Texas Ports-to-Plains highway system;
      2. Appoint an independent inspector general and an ombudsman at TxDOT;
      3. Increase the use of Texas ports from Orange to Brownsville and improve rail and road systems from the coast to the interior of Texas;
      4. Improve and increase efficiency of the state’s rail system along existing right of ways; and
      5. Use telecommuting and staggered work schedules to ease traffic congestion and decrease pollution. Texas once had and can again have a freeway system that is the envy of the nation. I will make that happen.
      6. I am adamantly opposed to any toll roads in Texas.
    END

    by Carole Strayhorn


    George Eliot GeorgeEliot2009@yahoo.com


    August 21, 2006

    TxDOT Seeking Submissions for Transportation Publication


    TxDOT has a new quarterly magazine and its first publication is now available online. The quarterly called Horizon is seeking manuscripts, preferably original, (i.e.,articles, commentary, and book reviews) which are timely in scope and relevant to transportation.

    If you know of someone with credentials/background in transportation or finance who is in a position to offer an authoritative perspective that challenges TxDOT's PR blitz please forward this information to them.

    Alice M., Citizens for a Better Waller County

    Horizon, a quarterly policy publication, examines topics across all modes of transportation, reflecting the concerns of policymakers and leaders in government, industry and the general public. It provides analysis and commentary from transportation experts.

    Summer 2006: The Future of Transportation Finance ( ftp://ftp.dot.state.tx.us/pub/txdot-info/gbe/horizon/horizon_summer2006.pdf) [pdf, 42 pages, 2.25 mb]

    A Quiet Crisis in Transportation Finance: Options for Texas by Martin Wachs, Ph.D., RAND Corporation. Discusses transportation financing choices facing state and local governments.

    The Return of Private Toll Roads by Robert Poole and Peter Samuel, Reason Foundation. Outlines the history and significance of tolling.

    Mobility: All Roads Lead to Texas by Joseph Giglio, Ph.D., Hudson Institute. Emphasizes the need for innovative funding strategies for mobility projects.

    Thinking about the Future of the Highway Program by Kenneth Orski, Editor, Innovation Briefs. A commentary challenging us to engage in the important transportation funding conversation.

    Coming Fall 2006: Innovations in Project Delivery

    To subscribe to Horizon http://www.dot.state.tx.us/services/government_and_business_enterprises/horizon/sub_form.htm

    Fall 2006 Issue Theme: Innovations in Project Delivery Deadline for Submissions: August 31, 2006 to John Sabala at TxDOTHorizonEditor@dot.state.tx.us • (512) 416-2386.

    Submission Guidelines for authors Horizon is a journal of the Texas Department of Transportation, Government and Business Enterprises Division. It provides innovative and trend-setting articles about transportation policies in Texas and throughout the world. Research findings and policy issues are presented in accessible language to allow for discussion among policy-makers, professionals, and citizens.

    The journal seeks manuscripts, preferably original, (i.e., articles, commentary, and book reviews) which are timely in scope and relevant to transportation.

    1. Submit manuscripts by email in MS Word format to the Editor at: TxDOTHorizonEditor@dot.state.tx.us

    2. Acceptance of manuscripts for publication is subject to approval by the editorial staff.

    3. The author must inform the editor if the article has appeared in, or was submitted to, any other publications. The author must provide written approval from the publication in which his article appears. If the article was presented as a paper at a seminar or other event, please state the location, time, and event.

    4. Sales presentations for organizations, promoting a particular product or service, are not suitable for publication.

    5. The text of manuscripts is to be double-spaced and 12-point type. Articles are limited to a maximum length of 2000 words (approximately 5-6 pages); commentary and book reviews are limited to a maximum of 1000 words.

    6. The manuscript should have a title page which includes the names, affiliations, addresses (mailing and email) and phone numbers of all authors. Brief biographical sketches for all authors should be included with the manuscript.

    7. Include an abstract that briefly describes the contents, procedures, and results of the manuscript and does not exceed 100 words.

    8. Endnotes are to be used rather than footnotes and placed at the end of the manuscript. Footnotes may be occasionally used within the document for clarification purposes, but not for citing references.

    9. The Modern Language Association Style (MLA) is to be used for endnotes and references. At the end of the manuscript, complete references are listed alphabetically (not by number) by author surname, government agency, or association name.

    10. Photo/Art Guidelines. • If you provide photos, please include caption, photographer’s credit, and written permission from the photographer for each image.
    • If sending compressed files, please send as a self-extracting file (SEA).
    • All photos must be scanned or saved at 300 dpi or greater and sent separately from the document. Please send photos in high resolution: JPG, TIFF or GIF file formats.

    George Eliot GeorgeEliot2009@yahoo.com


    August 11, 2006

    My Speech on the Trans-Texas Corridor


    By James Shive

    The environmental impact of the TTC 35/NAFTA Highway on rural and urban dwellers would be immense, just one cog in a future plan to depopulate rural Texas and require the creation of mega- Sustainable Cities.

    How is this to be?

    Let’s start in the summer of 1992 in Rio de Janeiro Brazil at the UN Earth Summit. Two issues of interest came from that summit, one is the Biodiversity Treaty with its “Global Biodiversity Assessment Report”; the second is Agenda 21 or Smart Growth. By following these documents blueprint to their end, will result in the elimination of the rural way of life, the growth of human living zones as compact mega-cities and transportation designed to support these goals. A design planned with limited access, allowing entrance and exit only at preplanned destinations. Designed to limit and hinder movement form outside the approve transportation corridors by the restriction of access to and limitation of approved crossings points. Resulting in a whither on the vine of the rural way of life, corporatization of agriculture, restricting access to the outdoors and elimination of private property rights.

    Sound far fetched, look at how NAFTA has expanded with the Central American Free Trade Agreement or the recently failed Free Trade of the Americas Agreement. Additional, consider the March 23 2005 Security Prosperity Partnership between Mexico, US and Canada, which contains language that can be interpreted as eliminating the US National Border. Can not happen, please go to their web site SPP.GOV or read “Creating A North American Community” at CFR.ORG.

    This Corridor and all the others to be built or converted to toll facilities in the future is just part of a grided control structure imposed upon us and a required part of the future infrastructure need to implement the above agreements. This is much bigger than just a transportation corridor that is 1200 feet wide. It will be one part of the chain that will bind you and your posterity down, taking the freedom our fore fathers fought for, that which our complacency and instant gratification needs is costing us, it loss; thus allowing a change in our statue as once freemen to one of a serf. This change is possible because too many believe that government will take care of us and will do no harm.

    Send in written responses by or before August 21st.
    Here's James Shive's written response.


    Mr. Ed Pensock, Jr., PE
    Director of Turnpike Corridor System
    Texas Department of Transportation
    PO Box 14707
    Austin TX 78761-4707

    Oppositional Comments to the TTC 35 Tier One DEIS and request for No Action Option be selected.

    TX DOT studies do show that there is a vehicle traffic problem on IH 35 from San Antonio to Temple and an increase need for rail traffic from the Brownsville to Houston area but TTC 35 is not the answer. Please consider the building of a continuous upper deck as a non-tolled freeway with under passes at interchanges where an upper deck would not be feasible inside of Austin proper while preserving the current freeway and access roads.

    This TTC Plan uses our gas tax dollars going to support private corporations to build TTC then and toll for the next three generations to pay under the auspices of a Private Public Partnerships for better government. There was a word used in the 1930 for the same actions, it was Fascism. With this being called the NAFTA highway and with the additional following agreements, Central American Free Trade Agreement, the failed but to be revisited Free Trade of The Americas along with the Security Prosperity Partnership of Canada, Mexico and the United States, we as the working class of this state and nation are being eliminated through the importation of cheap labor an exportation of our jobs. Additionally, this corridor facilitates the creation of an access to the “North America Community” resulting in the loss of or national sovereignty and turning Texas into a third world nation.

    When the above is coupled with the environmental impact this corridor brings, it results in nothing less than the devastation of communities and their way of life in rural Texas. By limiting the access to and or across the Corridor, cutting farms and ranches apart, by-passing small towns resulting in their demise and providing tacit support for a total take over of agriculture by Corporate Agri-Giants like AMD, Monsanto and with meat packers like Tyson/Cargill receiving information from the National Animal ID System changing the face of cattle ranching, rural Texas will cease to exist. Thus forcing those displace by the TTC Plan to move into approved urban development areas as outline in Agenda 21 or “Smart Growth” as dictated from the UN Earth Summit in 1992. Also this corridor is creating the restrictive barriers of approved travel/no travel zones helping to implement the main goal of the Biodiversity Treaty of rewilding our Nation and restricting human access in Texas to rural farm or ranch land thus restricting outdoor recreational activity to those who are privileged by either wealth or status.

    One must also look at the ramification of allowing the People’s Republic of China to develop deep water port in Mexico with direct unrestricted access to TTC 35 with a destination of Kansas City Kansas. When one takes into account that this county does have the Military Ability to mount and sustain an attack on this county with the largest standing Army in the world, building this custom made invasion route could be one of the biggest strategic blunders this nation has made since giving away the Panama Canal.

    Our state and our future are more important than the short term monetary gain realized from the selling of our land to foreign speculators. This country was built for the people with their right to own private property--not one in which the populace is relegated to a place of serfdom paying for the enrichment of the few.

    James Shive Jr.

    Atten. James Shive: GeorgeEliot2009@yahoo.com

    August 8, 2006

    Is the Trans-Texas Corridor I-69 really on it's way?


    Here's a picture our friend Nate* took today. They had these about every five miles up and down Hwy 183 and Hwy 77 down around the valley. The last one came from his photo shop. And here's a link that you can go to for a look at their bigger plans. http://www.texansagainsttolls.net/nasco.html


    Pictures by Nate*

    What concerns us is that the required TX-DOT public hearings are not over.

    TX-DOT has made very little, to almost none, of this information about the roads they plan to build and the hearings available to the public when requested via the open records act.

    They plan to remove farmers and ranchers from their land using eminate domain laws in HB 3588, and HB 2702.

    As far as we know there has never been an election anywhere to decide that we want to build these routes, or that we want to have Trans-Texas Corridors for Texas.

    And, Governor Rick Perry has signed an agreement with a Spanish corporation CINTRA, which to this day remains unavailable to the public for review.

    Pictures by *Atten: Nate at GeorgeEliot2009@yahoo.com

    George Eliot GeorgeEliot2009@yahoo.com



    July 28, 2006

    My VERY SIMPLE TAKE on the idea of Tolling Hwy 290E


    1) Hwy290E is an existing road that has already been already paid for. It was built with our Taxes and CANNOT be taxed again. That, in and of itself, stops any discussion about tolling Hwy290E right there.

    But further:

    2) The necessary upgrades have been anticipated and have already been paid for by our Taxes. Any upgrades due, (or over due), have been delayed by TxDOT in anticipation of the new free money from the tolling Hwy290E scheme.

    3) So, pay any costs of upgrading Hwy 290E from the cause. If the traffic flow from IH-35 to Manor is going to be increased because of SH130, then any additional upgrades to Hwy290E needed for this reason should be paid for by the tolls collected from SH130 - NOT FROM ANYWHERE ELSE. In other words - if you are going to build it and you need to charge someone, charge the people using SH130, NOT the people just trying to get back and forth to work and/or school on Hwy290E.

    4) The residents of NE Travis county that use Hwy290E on a daily basis, (or anyone else for that matter), SHOULD NOT and WILL NOT pay any additional tax to use our paid, existing roadway.

    5) This idea that the Hwy290E Toll Road will be "a road in addition to" the existing flow that we have now and that we will lose nothing, IS A FLAT OUT, BOLD-FACED LIE. The traffic flow on the lanes that they were NOT going to toll because they will be used as access roads, would be reduced by ingress, egress, intersections and a 20mph lower speed limit than exists now - that is NOT what we have now.

    6) The building of a NEW roadway, one that had not existed before, like SH130 and Hwy183A, is the perfect and proper use of a Hwy Tolling Scheme to finance its construction. NOT FOR ANY PAID, EXISTING ROADWAYS. If TxDOT would like to build a completely new road, (like SH130 or Hwy 183A), maybe Hwy290E-A to relieve traffic by offering an alternative to the existing road - go for it, but don't take our road from us, turn it into a Toll Way and proclaim that they did us a favor. Yes - TxDot has told us that they have "nothing to do with the tolling or not tolling of the roads". They have been directed to put all of their energy into redesigning Hwy290E as a toll road and not just designing the necessary upgrades to improve traffic flow as the non-tolled road that it is. (All of this does not even begin to discuss how it appears that Toll Way will economically KILL Manor, Texas.)

    7) Nothing set in motion to date by ANY "Tolling Authority" or ANY Governmental Entity is set in stone. There are no "final dates" for discussion or input. As far as we are concerned, we will not allow it to happen even if they think that "its a done deal" - its not. They thought that before and were proved wrong in South Austin by "the people of the area" not allowing them to follow through on their Toll plan.

    8) If only a fraction of us stand behind the no additional tax (or Toll) on Hwy290E then the "Public Officials Elected and the Private Individuals Appointed" that have come up with the ridiculous scheme of tolling it, will have no choice but to obey our desires. They are working/serving us, NOT the other way around! This "Toll Hwy290E" issue is no more complicated than this!

    I hope everyone that uses Hwy290E will join together to do the right thing and not just oppose this ridiculous idea, but to let those in power know that we NOT GOING TO ALLOW IT TO HAPPEN. Democrat or Republican, Incumbent or Newcomer, all need to realize that their tenure in office will be short lived if they do not vote as we direct them to.

    This is the view of just one VOTING family in NE Travis County, if its yours too - jump in, get active and make your voice heard. Please get involved and support the groups in our area fighting for our rights! I cannot endorse all of these groups, but appears that they are all working to our end. Here are a few and I am sure that there are others:

    http://www.blacklandprairie.org/
    http://www.keep290free.com/
    http://salcostello.blogspot.com/
    http://www.texansagainsttolls.net/

    Chuck Garner
    NE Travis County


    July 27, 2006

    Corridor Not Answer for Rural Texas


    http://www.taylordailypress.net/articles/2006/07/27/news/opinion/news01.txt

    By Susan Garry
    The Texas Department of Transportation will show Taylor-area residents the Draft Environmental Impact Statement (DEIS) on the TTC-35 portion of the Trans-Texas Corridor on Tuesday at Taylor High School. This DEIS shows the Recommended Preferred Corridor Alternative passing west of the Taylor area.

    Even though Taylor is not in the Recommended Preferred Corridor Alternative, the edge of the area, called Reasonable Corridor Alternatives, cuts across Taylor. Thus, Taylor-area citizens need to stay informed about the corridor project as it proceeds.

    Currently, some officials are saying that the vehicular part of the corridor through Williamson County is SH 130, which is already under construction west of Hutto. State Highway 130 is within the Recommended Preferred Corridor Alternative. However, TxDOT's Randall Dillard was quoted in the Taylor Daily Press as saying, “The corridor would provide outstanding economic development opportunities for Taylor much like SH-130 did for Hutto.

    However, Taylor is not in the Recommended Preferred Corridor Alternative.

    Does Mr. Dillard mean that a second major highway will be built between Hutto and Taylor, just a few miles east of SH 130? Does he mean that SH 130 will not be the corridor route through Williamson County and the actual corridor might include Taylor? Does he mean that portions of the corridor other than vehicular - such as pipelines and utility routes or the six-track rail element - would impact Taylor?

    If this is the case, Taylor would not realize “outstanding economic development opportunities.” The pipeline/utility corridor segment would negatively impact Taylor by removing much land from the tax rolls with no economic development. The same can be said for the six-track rail element, which would bypass Taylor, removing land from tax rolls with no economic benefit.

    The recent study commissioned by Williamson County commissioners concluded that the Taylor area could not support a rail hub or depot.

    The corridor plan calls for thousands of miles of a one-fourth-mile-wide corridor criss-crossing the entire state. The negative impacts of such a monstrosity are too many to be enumerated here, but they include environmental, economic and social problems for towns and rural communities all over Texas.

    The DEIS does not show a specific need for the corridor. It justifies the corridor merely by showing projected population increases in Texas. It does not use specific transportation projections for the problem areas in the state and does not show how the corridor will alleviate the traffic problems, which are in and around major metropolitan areas.

    Even though it seems that Taylor may not be harmed by the corridor right now, I encourage residents to attend the Tuesday hearing and to make comments about impacts on the entire state of Texas.

    A period to look at displays and ask questions begins at 5 p.m. The formal presentation begins at 6:30 p.m. You may make oral comments during the hearing or submit written comments, which must be received by TxDOT by Aug. 21. Comment forms should be available at the hearing.

    We can all see that congestion in some urban areas of the state needs to be alleviated by new or improved transportation projects, but carving up the state with a massive corridor is not the answer to localized problems.


    July 24, 2006

    Re: Ben Wear’s “Miles and miles of taxes”


    http://salcostello.blogspot.com/
    http://www.statesman.com/search/content/news/stories/local/07/24wear.html

    Dear Editor,

    Ben Wear’s article “Miles and miles of taxes”, 7/24/06, asks readers if there are other options to privatizing and tolling Austin’s public highways.

    Yes there are.

    Currently, blue Austin is the only city in red Texas (and the country) being force fed the extreme - to toll most of our existing freeways. Since the right of way, and in some cases, construction is already 100% funded with tax dollars, these are double tax tolls.

    In contrast, dozens of Texas cities and counties are lining up for a common sense approach called Pass Through Financing (PTF). A nontolled option where the state reimburses local government for the road.

    Gov. Perry’s TxDOT would rather Austin bureaucratically toll most of our freeways. We’ll continue to pay the STATE gas tax, while we LOCALLY pay the costly maintenance - forever.

    Tollers tell Travis County Commissioners that our roads are “not right” for Pass Through Financing.

    TxDOT’s own brochure mentions NO restrictions: www.dot.state.tx.us/publications/tta/pass_through.pdf

    Sincerely
    Sal Costello
    Founder of People for Efficient Transportation



    Counter Point to Mike Behrens Editorial in the Statesman

    Wed, 19 Jul 2006

    Dear Toll Opponents:
    I was livid (again) after reading Mike Behrens' guest editorial in the Statesman the week of July 17th. They've had three pro-toll editorials since Eddie Rodriguez's editorial that struck one for our side. I wrote a letter to them recently, thus have "used up my dime's worth of free speech" in the Statesman. Please, please, write letters to the editor responding to this guy's lies. People have to call them on it. Use stuff from this letter/editorial if you need to.

    Fancy Fairchild
    KEEP290FREE.com

    Mike Behrens, Executive Dir. Of TxDOT, said in his guest editorial that Texans always have a seat at our planning table. The trouble with TxDOT is, they always invite Texans to the table after the meal is over and the table has been cleared. For example, the Trans-Texas Corridor project was signed off on, planned, and deals for financing made before Texans were invited to participate.

    He also invited all Texans to attend the public hearings on the TTC-35 segment. As a fervent opponent of this project and the entire Trans-Texas Corridor, I also invite Texans to these hearings. I invite you to witness the extreme opposition the public has to this gargantuan, wasteful plan. When people speak, their outpourings of grief and rage are truly moving. Anyone but Tx-DOT officials, road contractors, or real estate developers will be impressed by the public’s overwhelming anger about TxDOT’s plans.

    They are angry for a hundred different reasons: It will cut a quarter-mile swath through the state so that you will have to travel up to thirty miles to get to a place you can see across the corridor (and pay a toll to cross it!) It won’t help urban congestion because it’s too far from urban centers. It will take economic assets away from Texas communities by rerouting commercial trucks and limiting traveler access to local services, lodging. It will increase pollution and dependence on foreign oil.

    Mr. Behrens likens this project to FDR’s interstate highway program. But I’ll bet FDR never signed a secret deal with a foreign company to profit from the road and own it for forty plus years. That foreign company, CINTRA, doesn’t have enough money to pay for it, so it will be borrowing from our debt-burdened federal government.

    The opportunities he cites along the path will be the fast-food chain restaurants, slick new gas stations and motels offering minimum wage jobs that people will have to spend extra time and fuel driving to.

    Times are different from the 1930s. Roosevelt never had to contend with terrorists (the Trans-Texas Corridor would be a natural target), global warming, or the sharp increases of fuel prices that we have now. Unlike Roosevelt’s plan, this will take needed resources away from the many and benefit only a very few. The people of Texas understand that.

    Fancy Fairchild
    panicked@ccms.net

    Thu., Jul. 20, 2006

    "Legislators Fired!"

    http://www.austinchronicle.com/gyrobase/Community/Postmarks?StartTime

    “Legislators fired” — that should be the next headline in newspapers throughout Texas.

    What a sham our elected officials are.

    Instead of working for Texas families and their children, they continue their ineptness and special-interest motivations.

    It is an outrage that so little was accomplished once again in a legislative session and elected officials must be held accountable by the voters, from the governor right on down the line.

    Voters need to get smart finally and vote out the vermin proliferating at the state capitol.

    Furthermore, special interests must be banned from contributing huge amounts to legislative campaigns.

    It’s time for Texans to hold elected officials accountable and to take back their legislature.

    Jamey McGhee Austin

    June 27, 2006

    Rodriguez: A heavy toll; Almost all of the planned pay-as-you-go roads are in East Austin

    From the Austin American Statesman (Statesman.Com)

    Eddie Rodriguez, STATE REPRESENTATIVE, DISTRICT 51

    I was reminded recently why I voted against the Phase II toll road plan for Austin. At the June meeting of the Capital Area Metropolitan Planning Organization, the board (on which I serve) viewed a slide that mapped the toll roads planned for Austin. Most of those in Travis County were east of Interstate 35, and every single mile of toll lane in the City of Austin was on the East side. Texas requires us to develop a plan in order to receive state transportation money. Our critical need for new highways can't be met by existing levels of state and federal funding. So, the state extended special borrowing authority to local areas — in our case, the three-county area of the Central Texas Regional Mobility Authority, which covers Travis, Williamson and Hays counties. Such loans — transportation revenue bonds — must be used to develop a system of toll roads, and they must be repaid by quarters and dollar bills collected at toll booths.

    As each metropolitan planning organization complies, by designating transportation corridors under a toll road plan, that area qualifies for the balance of state transportation money.

    But designating those corridors creates immense opposition from affected neighborhoods — and those with political clout have been most effective in resisting toll roads in their area.

    Residents in the eastern part of the city have tended to have lower incomes and be less involved in the political process. That helps to explain why CAMPO's Phase II has scheduled almost all of the mandatory toll roads in East Austin's back yard.

    For generations, those residents have disproportionately endured power plants, landfills, tank farms, wastewater treatment plants and excessive industrial zoning. Now, we see plans for East Austin to bear most of the burden of funding toll roads — so the rest of the city can qualify for other state transportation money.

    In the plan, only 37 toll lane miles lie west of I-35; a whopping 136 miles of toll lanes are planned east of I-35. With just a little math, you can see that the east side will fund about four times as many toll miles as the west side. The statistics within the city are even worse. Phase II directs the state to establish all toll lanes in East Austin.

    In July 2004, the CAMPO board adopted eight resolutions detailing its intent for the implementation of toll roads. One resolution addressed fair and equitable treatment of all citizens in bearing the burden of the toll roads.

    That intent was apparently abandoned. In fact, 46 miles of Texas Loop 360 had been planned as a future toll road in the first phase of this project. After a huge protest from residents in that area, CAMPO decided not to fund it — leaving East Austin to pay the tab.

    I have a problem with that.

    When CAMPO votes on Phase II in the next month or two, we could be in serious jeopardy concerning our own resolution to see that this toll plan is fair. The lack of social equity in the plan is a concern that will weigh heavily on my voting decision.

    We Austinites care deeply about our city and the people who live on both sides of the I-35 divide. I'm tired of the East versus West debate. I want to see both sides treated fairly and equally. But I have an obligation to my district, and to all like-minded Austinites, to raise this issue of disparity in this toll road plan.

    Rodriguez represents East Austin in the state Legislature

    June 23, 2006

    TOLLS LEVIED EAST OF I-35

    Reprinted from www.AustinChronicle.com June 23, 2006

    Dear Editor,
    I understand that the Chronicle has limited space for news coverage. As is often the case, coverage of toll road issues leaves out the concerns of people living east of I-35. In a nutshell:

    CAMPO has approved building brand new "free" freeways west of I-35. Not a single mile of new untolled freeway is proposed for east of I-35.

    CAMPO will not toll any roads west of I-35 that had previously been funded with gas tax dollars. Every mile of every road east of I-35 that was previously funded with gas tax dollars will be tolled.

    CAMPO has approved the tolling of four existing freeway facilities east of I-35. Not a single existing freeway facility west of I-35 is slated for tolls.

    CTRMA has publicly stated that toll roads east of I-35 will be used as "cash cows" to subsidize road projects west of I-35.

    CTRMA director Mike Heiligenstein said that replacing tolls with increased gas taxes would cost "$2 to $3 dollars per gallon." CAMPO staff estimated the cost at "1.6 to 2.1 cents per gallon."

    None of the new "free" freeway projects proposed for the CAMPO area are located in Travis County. Travis County gas tax payments will be shifted to other counties' "pass-through financing" projects to subsidize sprawl, or the Trans-Texas Corridor boondoggle.

    US 183S, if built as current plans propose, will have 18 lanes where it crosses the Colorado River.

    Vincent May
    Elgin


    TOLLS WILL BE A BURDEN

    Reprinted from www.AustinChronicle.com June 23, 2006

    From:Carol Cespedes
    Letter to the Editor that appeared in the Austin Chronicle on 6-23-06

    Dear Editor,
    Kimberly Reeves' article on 290 West highway planning through Oak Hill ("Y" Can't We Be Friends?) did a fine job of showing the context of highway planning. We appreciate the Chronicle's work in showing the complexity of decision-making and the breakthrough recently achieved by Fix290 as we adopted a collaborational rather than confrontational approach to TxDOT and the CAMPO Board. As an insider in Fix290 (chair and spokesperson for the coalition), I see only two omissions that need to be understood by the general public. First is the absence of any reference to the impact of the highway on the Edwards Aquifer. We have authoritative reports that all the detention ponds and filtration systems engineered by TxDOT will not be enough to take care of stormwater runoff from their 12-lane highway nor to mitigate the pollution and flood danger posed by the widening and channelization of Williamson Creek. The issue of environmental damage caused by an over-built highway deserves an article in itself. The second is the absence of any mention of the strong support the Fix290 Coalition has received from Texans Against Tolls. This is a dedicated group of community activists who have worked long and hard on the issue of tolls. It is unfair to dismiss them as "hectoring hatemongers." Those that I know are motivated by a passion for social justice and a conviction that the Phase 2 Toll Roads will not prove financially viable and will prove to be a long-term public burden. Fix290 is gratified by the cordial response from the CAMPO Board after our presentation on June 12. We see doors opening and a real possibility that we may in fact "be friends" as we work toward better solutions for transportation, neighborhoods, and the environment.